Title Image

Kelana Jaya LRT Extension

Home  /  Completed Projects  /  Kelana Jaya LRT Extension
The LRT Kelana Jaya Line is the fifth rail transit line and the first fully automated and driverless rail system in the Klang Valley area. Servicing 37 stations, the line has 46.4 km of grade-separated tracks running mostly on underground and elevated guideways. The extension was opened on 30 June 2016, together with the final part of the Sri Petaling line extension from Bandar Puteri to Putra Heights.

 

GRUNDFOS Pumpset / Booster system supplied:-

 

– 5 set Hydro MPC-E booster system 2xCRE15-3, 3kW
– 4 set Hydro MPC-E booster system 2xCRE5-4, 1.1kW
– 4 set Hydro MPC-E booster system 2xCRE3-5, 0.75kW
– 1 set Hydro MPC-E booster system 2xCRE15-2, 2.2kW
– 1 set Hydro MPC-E booster system 2xCRE10-3, 2.2kW
– 1 set Hydro MPC-E booster system 2xCRE5-6, 1.1kW
– 1 set Hydro MPC-E booster system 2xCRE5-7, 1.1kW

 

Category: